Project Case Study – Cambridge

Materials Supplied:

  • 115 metres of 2.4m High Greenhoard® with In-ground fixing method
  • 1no 5.0m wide double leaf vehicle gate and 1no 1.2m single leaf pedestrian gate.

Project Details:

A main contractor specified Greenhoard® as the most suitable hoarding solution due to it being a durable and sustainable alternative to timber hoarding that is quick to erect, and capable of multi re-use, therefore delivering long term cost savings and reducing waste to landfill and the carbon footprint for the project.